Now that the exterior of the house is mainly complete, the builders will be finishing on site and handing over to us to make a start on the interior.
We had originally planned for the builders to do everything, but cost estimates quickly became prohibitive once they’d been discussed and confirmed. The build costs rose over 30% above the architects calculation estimates, leaving us with no alternative but to complete the house ourselves. We’d allocated some contingency, but the magnitude of this was beyond what we could absorb.
We are moving up and into the static in a few weeks time so that we can work full time on the build. As two IT people rather than builders, this is going to be a challenge!
The first week will be busy connecting water and power to the caravan and hooking up the gas bottles for heat and cooking so that we’ve got the basics in place. We also need to build steps for easier access, replace some of the flooring, fit a new boiler and give it a quick lick of paint. This will be our home for the forseeable few months and we need it to be warm, dry and comfortable. Only then can we make a start on the house itself.

Then we start with the foil membrane on the inside of the walls for heat retention and moisture control. There is already protective waterproof membrane on the outer walls underneath the cladding, but to ensure that the house is as sealed as possible we need to wrap the inside of the walls too before plasterboarding.
After that, the underfloor heating, screed and MVHR ducting. There’s something that gives me infantile pleasure as part of the generation that grew up with Alien to have ducting in the house… 🙂.
It’s certainly going to be different to our current lives, and I’m just so damned grateful that husband is a practical man who doesn’t seem daunted by what seems to me to be a whole mountain of challenges…