Things are progressing slowly but steadily now. We now have a flooring membrane throughout the house laid over the insulation sheets and edged with foam strip to allow for the screed expansion.

Exciting times, although the smell of the plastic was overwhelming for a bit!
We had originally thought to use a grid to lay the pipes onto, but as we’re tight for depth to the window base, husband decided to lay them free-form to save a few millimetres extra for the screed.

The cryptic markings which appeared mysteriously overnight apparently direct the traffic for the underfloor pipe layout.

These will be laid throughout the ground floor with the exception of the small room that we plan to use as a pantry, which we want to keep as cool as possible.
With a bit of luck we should be ready for the screed in the next few weeks.