Preparations for winter

We’re preparing the static for the end of October as best we can whilst still being several hundred miles away.


It’s on the croft and tonne bags of hardcore have been moved into place this week to provide it with a bit more anchor weight. Kind neighbours have strapped the hardcore bags to the static with high strength lorry straps for us.

We’ve been warned that there are often ninety mph winds that blow in the winter, and that the weight of the caravan alone won’t be enough for safety.

We hope that the combination of these tethered weights, an emplacement of strategically placed sandbags to funnel the prevailing south westerlies, and the protection afforded by the house will be enough to protect it from the worst of the winter gales.


We also need to level and secure the static more effectively, and for this we are going to use railway sleepers which we will have delivered to site over the next couple of weeks. We’ll use them to construct steps up to the caravan door as well so that our lovely but ancient spaniel (and equally ancient and rickety croft wifie) can make it in and out more easily 😊.


We’re also buying paint, brushes and supplies this week so that the first few days after arrival will see it cleaned and freshened up inside ready for occupation. Gas bottles and connections to water and electricity will also have to happen before we can move in.

It’s going to be a very busy October and November. 🙂

The Inner Project Manager

roomplanner

Now that the building warrant is in, we need to spend the next few weeks finalising decisions on kitchen, bathroom and flooring options. I started the process earlier this summer, but parked the initial designs when we got consumed with such things as the access road, electrical points and window types, all very essential for the warrant submission.

I didn’t really dare breathe much more on the more cosmetic elements, almost feeling that it was in danger of jinxing things somehow to spend time on this without having all the permissions in place. But on Friday I picked up the phone to the kitchen designer in Scotland, sent him the final room dimensions, and told him that it was time to re-engage.

Lock and load, kitchen designer! I’m back. And with some new ideas!

Poor man….

In some ways the break of six months without fully considering things like tile colours, tap designs and shower fittings has made things easier, and my vision of what we want clearer. I’m more convinced than ever that simple is best, with good quality, natural materials wherever possible. Most of the ideas that I originally hatched six months ago still hold water, but some things have changed, and I’m grateful that we have had that time to alter things.

The inner project manager within me is now itching to list out all the decisions we need to make, create mood boards, check out suppliers, arrange samples, agree visits wherever possible to physically try things out (like the bath), estimate costs, and get on with it…