A friend commented that there had been precious little recently in the way of house build updates. Which is very true. Progress has been slow, and we are still taping and foiling some months into the process.
A number of things have conspired to make what should have been a relatively quick job a complete marathon.
Husband has had to fill and tape all wall, door and window seams throughout the house BEFORE foiling, as well as taping everything again AFTER foiling.
This has turned into a huge, time-consuming undertaking which he felt was necessary because of gaps left by the builders. Gaps that if left open would have compromised our structural water and air tightness.
His faith in the quality of the work by the builders has been severely dented as these are not cosmetic problems that we felt could be covered over, sure to cause us issues some years down the line.
He has been doing this work alone, and other time-critical work has taken weeks away from this process, such as installing the house guttering and the start of work on the croft as Spring approached.
However, the end is in sight. The floor insulation for the next stage has arrived.

It arrived on a thankfully dry day, but a windy one. About 50 huge sheets of insulation which blocked the drive on arrival and which we had to manually carry between us into the house.
These sheets are big, requiring two of us to manoeuvre, but very light in weight, only 10kg each. They exhibited impressive aerodynamic properties as the wind caught them, acting like a sail, taking both our body weights to counter their desire to take off down the croft.
It took a whole afternoon to get them wrestled safely under cover into the house.
They’ve also provided me at least with a bit of a morale boost. They are a nod to the promise of progressing onto the next stage, which is laying these, then the underoor heating pipes, then screed, and us being a few steps closer to this being a house.
We will get there. Courage, mon brave!