Planning for the internals

Now that the exterior of the house is mainly complete, the builders will be finishing on site and handing over to us to make a start on the interior.

We had originally planned for the builders to do everything, but cost estimates quickly became prohibitive once they’d been discussed and confirmed. The build costs rose over 30% above the architects calculation estimates, leaving us with no alternative but to complete the house ourselves. We’d allocated some contingency, but the magnitude of this was beyond what we could absorb.

We are moving up and into the static in a few weeks time so that we can work full time on the build. As two IT people rather than builders, this is going to be a challenge!

The first week will be busy connecting water and power to the caravan and hooking up the gas bottles for heat and cooking so that we’ve got the basics in place. We also need to build steps for easier access, replace some of the flooring, fit a new boiler and give it a quick lick of paint. This will be our home for the forseeable few months and we need it to be warm, dry and comfortable. Only then can we make a start on the house itself.

Then we start with the foil membrane on the inside of the walls for heat retention and moisture control. There is already protective waterproof membrane on the outer walls underneath the cladding, but to ensure that the house is as sealed as possible we need to wrap the inside of the walls too before plasterboarding.

After that, the underfloor heating, screed and MVHR ducting. There’s something that gives me infantile pleasure as part of the generation that grew up with Alien to have ducting in the house… 🙂.

It’s certainly going to be different to our current lives, and I’m just so damned grateful that husband is a practical man who doesn’t seem daunted by what seems to me to be a whole mountain of challenges…

Of slow cooked stews and power tools


We’re now in the final few weeks of the London house as the October winds blow. We sit listening to the rain and wind blustering through the branches of the crab apple trees that flank the house, commenting ruefully to each other that this is an early trial for the Skye weather.

We’re making lists of what will be packed for storage and what will be needed in the caravan for the duration of the build.

I’m anticipating a cold, wet Highland winter in the caravan and days of hard physical work, something unfamiliar to our soft urban bodies. Not to mention my still recovering replacement bionic knees.

We’re going to ache and I’m sure that exhaustion will hit pretty quickly. Husband will bear the brunt of this as there are things that he can do that I simply can’t, so one of my small contributions will be keeping us fed. Food will be important for both fuelling tired muscles and keeping morale going.


I’m packing my slow cooker so that I can make soups and stews first thing in the morning to come into at the end of the day without too much effort. It’s comforting to come home to the warmth and smell of a lamb hotpot permeating the caravan when you’re tired, cold and wet. We should be able to raise a spoon and some chunks of bread if we have energy for nothing else!


The kitchen in the caravan is also pretty small so I’m trying to condense down what to pack to the most essential items only. Kettle, oven dishes, plates, cutlery, a few good knives etc. I suspect that our food will be basic until we are in the house, and eaten off laps, but that’s fine by us.


Forget the wild fantasies of feasting off venison and salmon in the Highlands – this is going to be lots of simple cooking designed to fill us up and keep us warm. Soups, porridge, stews and dumplings. Hearty fare, albeit with fresh local produce.

Whilst I’m looking at supplies, husband is restocking essential tools for the build. He got rid of a lot of tools when he moved from the North of England, thinking that they’d no longer be needed in London (and having no storage space for them).

Our living room here is gradually filling up with reciprocating saws, drill bits, power screwdrivers, steel capped boots and work trousers.

I hug myself in anticipation. Not long now until we pack up the car with our ancient spaniel and start the long, slow drive up to the island.

It’s all becoming very real… 👍☺️

Autumn cladding progress


Pictures taken on a blustery, rainy autumn day last week on the island. The first frosts were a few nights ago, so autumn is definitely well underway.

The larch cladding is nearly complete now. There seem to be a few bits left around the rear dormer bathroom window that have yet to be finished, but the scaffolding is down and we’re hoping that these remaining areas won’t take long.


We’re also still waiting for the water to be connected.

What’s needed before we can get approval to connect is a small value, simple return valve, but it seems that obtaining one and getting a plumber to fit it is holding everything up. It’s frustrating at this stage with just weeks to go until we will be living on site. We can’t live for long without piped water to the caravan, and with no date in hand for this to be done it’s a worry on a very long list of things to think about. It will happen.


I can’t wait for the larch to weather. It looks strangely stark in the landscape at the moment in its raw colour, and I much prefer the muted grey tones of weathered wood.

We have neighbours in a nearby  village on the island who have also just built a larch clad home and who are a few months ahead of us in terms of build progress. Theirs is silvering already, so I’m hoping ours will soften too very soon.



Darkest before the Dawn

The saying goes that the darkness is deepest just before the dawn.

As I sit here in our bedroom in the half light of morning listening to the birds on the nearby lake beating their wings against the water and the sounds of London slowly waking up, I understand that feeling.

We have this amazing dream that after two years of nurture, focus and hard work is now within inches of becoming reality. We are within just a few weeks of packing up our old house, getting in the car and driving with the dog to our new life on the island.We are weighed down with lists and arrangements, with disposing of things, and with decisions.

Although I have now finished work, husband still has three weeks to go and so doesn’t have the luxury of daily headspace to process things. I’m limited by what I can do to help. It’s a huge weight.

Covid 19 is on the rise again with the prospect of further lockdowns and travel restrictions which is adding another spoonful of stress and uncertainty to an already pretty potent mix.

I know that this will pass. I know that everything will get done, and that if it doesn’t get done the world won’t stop turning.I know this. We both know this.

We will find the space to hang on to the excitement of these new beginnings. Even when these feelings of excitement are heavily entwined with the decoupling from our old lives and all that this entails. Even when sleep is dominated with dreams of all the things we haven’t yet done. Even when our bedtime reading is all plumbing manuals and spreadsheets.

It’s important not to allow the “to-do” list to consume every waking moment and to reconnect with feelings of joy at what we are about to do.

Because of course it will all be worth it.New beginnings, a new way of life.The dawn is lightening the sky already.

We will be ready.

Preparations for winter

We’re preparing the static for the end of October as best we can whilst still being several hundred miles away.


It’s on the croft and tonne bags of hardcore have been moved into place this week to provide it with a bit more anchor weight. Kind neighbours have strapped the hardcore bags to the static with high strength lorry straps for us.

We’ve been warned that there are often ninety mph winds that blow in the winter, and that the weight of the caravan alone won’t be enough for safety.

We hope that the combination of these tethered weights, an emplacement of strategically placed sandbags to funnel the prevailing south westerlies, and the protection afforded by the house will be enough to protect it from the worst of the winter gales.


We also need to level and secure the static more effectively, and for this we are going to use railway sleepers which we will have delivered to site over the next couple of weeks. We’ll use them to construct steps up to the caravan door as well so that our lovely but ancient spaniel (and equally ancient and rickety croft wifie) can make it in and out more easily 😊.


We’re also buying paint, brushes and supplies this week so that the first few days after arrival will see it cleaned and freshened up inside ready for occupation. Gas bottles and connections to water and electricity will also have to happen before we can move in.

It’s going to be a very busy October and November. 🙂

The static looms….

We have been working our way through costs as meticulously as we can before the build actually starts. The architects estimates were way out. By a country mile.

It’s becoming clear that the only way that we can complete this project is to strip out £100k of costs, and that means a few things are sadly certain.

Firstly, that there is no way that we can afford the builders to do more than build the house. Groundworks, access road, house erection, cladding, guttering and windows. Everything else we will need to do ourselves.

Secondly, we will need to put a static caravan on the land and at some point move into it in order to finish the work. I suspect this means a Highland winter and Christmas in a caravan… 😬

Thirdly, there isn’t any chance that it will be complete as planned this year. The exterior build should be complete by the summer, but the interior will take us much longer to complete than it would with professional builders and will probably run into next year.

We will be offline whilst we finalise plans and put some things in motion.

Check in again soon!

Send warm socks!