Everything aches..

The first job we’ve had to do is to make the caravan habitable. For those of you that have been reading for a while, you’ll know that we were given a free static caravan in September, which was a hugely generous gesture.

However, it was very basic and hadn’t been lived in for a while. We had it transported to the croft and had to leave it empty for a further two months until we were able to move to the island, which didn’t help in the habitability stakes..(if that’s not a word, it should be).

When we opened the door for the first time on Saturday it was quite clear that it was damp and needed drying out before we could move in.

Storm Aiden made the process of working on the caravan too dangerous for the first few days that we were here. It needed levelling properly before we could do anything inside, but the 60 mph winds were rocking it like a boat. We had to wait until the storm passed.

The morning dawned calm and bright and the wind had at last dropped considerably. Husband had managed to secure the caravan so that it was safe to work in, and hooked up the propane supply to the gas fire so that we could start to dry it out. Whilst he worked on preparing the electrical supply I started the seat repairs and the painting.

As we suspected, everything ached by the end of the day. We are more unfit than we thought!

We got back to our B&B room weary in body but happy in spirit. We’re here at last and making progress, however slow that may seem.

We will get fitter as time passes, and despite the aching limbs and backs it’s still all worth it to be here.

Storm Aiden

We woke to 60 mph South Westerly winds whipping up the waves and crashing them onto the rocks at Ardvasar Bay. The forecast was grim. Storm Aiden was in control and would fury unabated for the next two days.

We had originally planned to level and stabalise the static as our first job, necessary before we could connect up the electricity, water and gas bottles. But there was no way that we could safely work under or around the caravan in this wind.

We’d purchased railway sleepers to create a stable platform for the static, and they needed to be cut to size, a job that we managed to do inside the shell of the house so that we could avoid the driving rain and wind.

For now, we need to wait for the weather to abate. And make sure that we’ve always got a Plan B and C in our back pockets so that everything doesn’t stop when we get a storm.

Just heard that England is going back into full lockdown from Thursday. Even though we’re not set up properly yet, I’m glad that we’re here rather than London for this one…

The final few yards

It’s less than a week now until we move, and we’re starting to flag a bit.

Every room is full of boxes, either full or waiting to be filled, lining the rooms like some cardboard termite mound whilst we squeeze through tunnels between them.

It’s tiring. Both the constant decision making process – to store, to the caravan, to the charity box, to trash – and the packing and manhandling of the boxes to safe stacks around the house.

There is nothing that brings home the stark reality of having too much stuff like the process of having to pack it away.

To be fair, the bulk of it is books. I honestly don’t know how many boxes of books we have. It must be in the hundreds.

Husband and I both share an abiding love of books, but combining our collections when we married three years ago has resulted in a veritable tsunami of books. Working in the book industry for major publishers over the last thirteen years has only fed the beast. It’s overwhelming. We’ve never had them all unpacked…

When we get to the island we’re going to have to do further weeding out and disposal. There simply won’t be enough wallspace to build enough book shelves to take them all, I’m sure of it.

However, we’re now on the final stretch. The last few yards.

The day of the move is almost upon us, She says with a big, tired smile.

Of slow cooked stews and power tools


We’re now in the final few weeks of the London house as the October winds blow. We sit listening to the rain and wind blustering through the branches of the crab apple trees that flank the house, commenting ruefully to each other that this is an early trial for the Skye weather.

We’re making lists of what will be packed for storage and what will be needed in the caravan for the duration of the build.

I’m anticipating a cold, wet Highland winter in the caravan and days of hard physical work, something unfamiliar to our soft urban bodies. Not to mention my still recovering replacement bionic knees.

We’re going to ache and I’m sure that exhaustion will hit pretty quickly. Husband will bear the brunt of this as there are things that he can do that I simply can’t, so one of my small contributions will be keeping us fed. Food will be important for both fuelling tired muscles and keeping morale going.


I’m packing my slow cooker so that I can make soups and stews first thing in the morning to come into at the end of the day without too much effort. It’s comforting to come home to the warmth and smell of a lamb hotpot permeating the caravan when you’re tired, cold and wet. We should be able to raise a spoon and some chunks of bread if we have energy for nothing else!


The kitchen in the caravan is also pretty small so I’m trying to condense down what to pack to the most essential items only. Kettle, oven dishes, plates, cutlery, a few good knives etc. I suspect that our food will be basic until we are in the house, and eaten off laps, but that’s fine by us.


Forget the wild fantasies of feasting off venison and salmon in the Highlands – this is going to be lots of simple cooking designed to fill us up and keep us warm. Soups, porridge, stews and dumplings. Hearty fare, albeit with fresh local produce.

Whilst I’m looking at supplies, husband is restocking essential tools for the build. He got rid of a lot of tools when he moved from the North of England, thinking that they’d no longer be needed in London (and having no storage space for them).

Our living room here is gradually filling up with reciprocating saws, drill bits, power screwdrivers, steel capped boots and work trousers.

I hug myself in anticipation. Not long now until we pack up the car with our ancient spaniel and start the long, slow drive up to the island.

It’s all becoming very real… 👍☺️

Preparations for winter

We’re preparing the static for the end of October as best we can whilst still being several hundred miles away.


It’s on the croft and tonne bags of hardcore have been moved into place this week to provide it with a bit more anchor weight. Kind neighbours have strapped the hardcore bags to the static with high strength lorry straps for us.

We’ve been warned that there are often ninety mph winds that blow in the winter, and that the weight of the caravan alone won’t be enough for safety.

We hope that the combination of these tethered weights, an emplacement of strategically placed sandbags to funnel the prevailing south westerlies, and the protection afforded by the house will be enough to protect it from the worst of the winter gales.


We also need to level and secure the static more effectively, and for this we are going to use railway sleepers which we will have delivered to site over the next couple of weeks. We’ll use them to construct steps up to the caravan door as well so that our lovely but ancient spaniel (and equally ancient and rickety croft wifie) can make it in and out more easily 😊.


We’re also buying paint, brushes and supplies this week so that the first few days after arrival will see it cleaned and freshened up inside ready for occupation. Gas bottles and connections to water and electricity will also have to happen before we can move in.

It’s going to be a very busy October and November. 🙂

More progress, and the static

The kindness of strangers never ceases to amaze us. We’ve been offered a free static caravan by locals on the island to live in whilst we complete the build.

It’s old but fully functioning. It will need a lick of paint, a new boiler and replacement carpet in the main living area, but with all of that and transport costs it will still save us many thousands of pounds.

I’d been researching static caravans and not only are they pricey but the haulage costs can be massive. Due to their ten or twelve feet of width they need a police traffic escort, and so even bargains elsewhere in the U.K. would cost many thousands to transport to the island.

(This image was taken before two years of mud from their house build site was trodden in..😊 it looks much worse now…)

The couple that have offered it to us have been living in it themselves until recently as they completed their own self build, and can make it available from September, which is perfect timing for us. We’re so grateful.

We will be siting it close to the house itself so that connection to power and water will be easier.

The foundations are progressing at pace now, helped by the recent good weather.

This does mean that it will be perched in a somewhat exposed position on the top of the hill of the croft, and a local friend suggested that tethering the static to concrete footings with lorry straps might be prudent due to the winter gales on Skye. We’ve asked the builders to create tether points for us in the hard standing at the back of the house site so that we can do just that.

We don’t fancy tumbling down the hill like a corrugated tin dustball in a storm…