Snow and seedlings

We’ve had a second bout of very cold weather over the last week, with a good few inches of snowfall, and blizzard conditions.

Friends living in a caravan a few miles away whilst they self-build their house have found their water tank and pipes frozen over these last few days.

Between the snow flurries

It takes me right back to our caravan days in the last really cold snap a few years ago with husband heading out into the snow in his dressing gown and wellies, clutching my hairdryer to try and thaw out our frozen water pipes. Unsuccessfully.

It makes me doubly grateful that we are warm and dry in the house in comfort now. In the evenings we fire up the woodburner and enjoy the sound of it crackling away cosily in the corner.

Some of my seeds have started to germinate. The cucumbers raced up, and we have a few chillies, lettuce, tomatoes and beans starting to show.

I think that they’re all a bit perplexed at the moment though. Bright sunshine through those big windows, lots of solar gain and warmth, but snow flurries just a few feet away!

Confused cucumber seedlings

Winter still has us in its grip. Cottage pies, warming breakfasts and slower days.

Cottage pies

It has to be done. We don’t take any of this for granted.

We have underfloor heating pipes…

Things are progressing slowly but steadily now. We now have a flooring membrane throughout the house laid over the insulation sheets and edged with foam strip to allow for the screed expansion.

Exciting times, although the smell of the plastic was overwhelming for a bit!

We had originally thought to use a grid to lay the pipes onto, but as we’re tight for depth to the window base, husband decided to lay them free-form to save a few millimetres extra for the screed.

The cryptic markings which appeared mysteriously overnight apparently direct the traffic for the underfloor pipe layout.

These will be laid throughout the ground floor with the exception of the small room that we plan to use as a pantry, which we want to keep as cool as possible.

With a bit of luck we should be ready for the screed in the next few weeks.

House build update

I can hardly believe that we’re in July already, but that seems to be where we find ourselves. The house build progress has been slow, but at last we are through the bulk of the sealing, taping, foiling and re-taping of the house walls and have moved into the next stage. Thank the stars that my husband doesn’t give up easily through what has been a marathon of a process.

Floor insulation slabs

He has been laying the insulation slabs on the internal floors in this past week in preparation for the underfloor heating pipes to go down. Then it will be the screed pouring before finally we have a level, warm floor for the house!

Work in progress

We have the plasterers booked in for September, so we need to complete the floors and basic pipe and wiring installation in the next two months to make sure that we secure their time. I know how quickly eight weeks will go, so it will be another busy time.

Our tinfoil-wrapped sitting room!

In parallel, I’m re-examining all the kitchen and bathroom material choices we made over a year ago. Prices and suppliers have all changed, and we need to get selections finalised and fresh estimates in so that we can secure fittings when we’re ready.

We’ve also sourced an excellent local lady joiner to make us custom built wardrobes and bookcases for the main bedroom, hall and sitting room areas at the end of the year. Hugh could build them, but having done everything else by then I suspect he will be on his knees. And the quality of her finished work looks excellent.

I’m especially excited by the prospect of the extremely high bookcase taking up the whole of the back wall in the sitting room. We’ll need a ladder to gain access to the upper shelves! But it will take a huge quantity of books. Just what we need.

Onward and upwards! We will get there.