Plastering, wiring, ducting & kebabs

Now is a really busy time for the build. We have two guys (the two Dereks) busily and speedily installing battens and erecting plasterboard panels, with husband wiring and ducting alongside them.

It means long days and not much in the way of breaks. He’s shattered when he collapses in front of the fire each evening. A good tiredness, I think – one born of a long days manual labour and visible progress, but certainly tiredness. We’re neither of us as young as we were!

The best I can do is provide tea and food as it’s needed, and finalise the many remaining decisions on bathroom and kitchen finishes from the caravan.

When I’m not browsing tile sites and bathroom fittings catalogues, or calling Home Energy Scotland for advice, I spend much of each day making flatbreads, cake, quiches, stews and soups.

My latest attempt at urban food is kebabs! Sliced leftover roast lamb, shredded red cabbage, garlic and mint yoghurt, harissa paste and baked soft flatbreads. When you don’t have a takeaway on the island, you make them yourself. Probably much healthier too.

I’m not even pretending that the pear frangipane tart was anything other than an indulgence…we need yummy things right now.

I’m also reading this. An excellent book, if slightly terrifying. It’s about the disappearance of insects due to pollution, pesticides, chemical runoff, changes in farming practices and climate change, and is written very accessibly and compellingly. Dave Goulson is well qualified to write about this, being a Professor of Biology, an expert on insect ecology and an Ambassador for the UKs Wildlife Trusts. Get a copy if you can.

So progress on the build is steady as we move through the highland winter. I’m starting to think about seeds and have ordered seed potatoes, onion sets and garlic. We’re still eating red cabbage and kale from the croft, at least what the deer haven’t eaten.

Soon, now. Spring is coming. Not long now.

Ducts!

They may not be big enough to crawl through, but what the MVHR ducts lack in girth they make up for in number…

It looks a bit like spaghetti-geddon at the moment, with the ducts going everywhere. These loose ends will be fed into a manifold over the appliance wall in the kitchen, hence the waving around in mid air look. Husband has assured me he has it all under control and I have, to be fair, seen much labelling and even checklist tables.

You can see from this photo how useful the posi joists are in accommodating pipes, ducts and wiring. The gaps between the steel sections are big enough to be woven between.

The plasterboards are also going up. It’s strange how much they change the dimensions you perceive in each room.

All in all, it’s feeling like a good start to the year. The rain and sleet showers come and go but watching them from the big windows at the front of the house whilst work continues within is always inspiring.